One of the options of concrete pouring and leveling is the use of ready mix concrete.
Get in touch with Mission Viejo Concrete Company on (949) 541-9282 for free estimates.
But before you can start using, you need to understand its basics. Here are FAQs on ready-mix concrete.
What is Ready-Mix Concrete?
A homeowner will order for tailor-made measures of cement, aggregate, and water. This makes the concrete ready to use.
How Is Ready-Mix Concrete Different From The Normal Concrete?
The key difference is in the mixing location. While the ready-mix concrete is usually mixed in an industrial setting before it is delivered, normal concrete is mixed onsite. This means that ready-mix concrete can help save a lot of time.
What Are The Benefits Of Ready-Mix Concrete?
Since ready-mixed concrete is pre-mixed n unique specifications, you can see a high-quality result that meets your needs. It can cost less than the regular concrete, so you don’t need to rent or purchase mixing equipment and storage. It will also be less expensive as compared to the regular concrete.
What Should I Do In Preparation For The Delivery?
Even though the concrete is prepared earlier, you will need to make the site ready. This should involve the storage area before use. You will also need to consider if you have the necessary tools and clothing for concrete pouring safely and professionally.
How Do I Ensure There Is Enough Supply?
You will need to accurately measure the space you need to fill. If it’s a large job, you should set aside 2% of your measurement as wastage. When done with the big pour, measure the concrete volume to figure out if it meets the quantity meets the requirements. If this doesn’t, you should get in touch with the supplier to mix more concrete.
How About The Curing Period?
It takes around fifteen days for the curing process to occur. This serves to ensure that there is no mater, chemicals, and hard use after the full hardening. After the concrete pouring, cement, and water result in a chemical reaction, this makes the concrete to harden and solidify the durability and strength. Hydration will work well when concrete has been placed in a moist environment before use. If not, concrete dries out too early, stopping the entire process. This causes the concrete to weaken.
To determine if ready-mix concrete is the right option for you, you should speak to a qualified and experienced concrete contractor in Laguna Woods.